What Should My HVAC Company Charge per Hour?
Build a labor-only hourly rate from wages, payroll burden, billable time, and company overhead. Switch to flat-rate mode to price a task with parts included, using the same editable operating assumptions.
Your numbers
Edit the starting assumptions to match your business.
Percent added on top of wages for payroll taxes and benefits.
Annual paid working hours per technician.
Technicians whose billable hours carry company overhead.
Annual operating overhead to recover through billable work.
Target company net margin, not the gross margin on a single job.
Your projection
$129.98
Target labor rate per billable hour
Break-even $116.98 per billable hourLoaded wage per paid hour
$47.19
Labor cost per billable hour
$72.60
Company billable hours per year
6,760
Overhead per billable hour
$44.38
Break-even hourly rate
$116.98
Flat-rate job price
$484.95
Job direct cost
$295.20
Job gross profit before overhead
$189.75
Flat job gross margin
39.1%
How we calculate this
- 1Loaded wage: $33.00 × (1 + 43% payroll burden) = $47.19.
- 2Labor per billable hour: $47.19 ÷ 65% billable efficiency = $72.60.
- 3Annual billable hours: 5 technicians × 2,080 paid hours × 65% = 6,760.
- 4Break-even: $72.60 labor + $44.38 overhead. Target rate applies your 10% target net margin.
Results are estimates from the values you enter. Replace examples with your own records before making business decisions.
What more jobs are worth
Use your own estimate for additional monthly jobs.
At 10 additional flat-rate jobs per month, the modeled annual gross profit before overhead is $22,770. The bridge uses this task's current parts and labor assumptions.
Rate-setting method
How does billable time affect your labor rate?
First load the wage with payroll burden.
The output is a labor-only rate.
Which published figures inform these assumptions?
Published input context
Defaults are informed by published sources. Use your own payroll, time, and cost records where you have them.
The BLS reported a May 2025 median wage of $29.33 an hour for HVAC mechanics and installers. That occupation-wide median is separate from ACCA's $33 contractor-reported average, and the calculator default uses the latter.
| Input / measure | Published figure | Source context |
|---|---|---|
| Average technician wage reported by contractors | $33 per hour | ACCA Contractor of the Future study |
| Benefits on top of wages | About 43% | All private industry, BLS employer compensation data |
| Technician time that is billable | 65% | Field Promax report, more than 10,000 data points from 300 HVAC companies |
| Paid hours per technician per year | 2,080 | Calculator starting assumption, editable by you |
| Average service ticket | $422 | ACCA Contractor of the Future study, service-ticket context |
| Median HVAC occupation wage, May 2025 | $29.33 per hour / $61,010 per year | BLS Occupational Outlook Handbook |
| HVAC occupation employment / projected growth | 440,900 jobs in 2025 / 11% growth from 2025 to 2035 | BLS Occupational Outlook Handbook |
| Private-industry wages and benefits, June 2026 | $32.82 wages / $14.07 benefits per hour | BLS Employer Costs for Employee Compensation, all private industry |
| Wages and benefits as shares of compensation | 70.0% wages / 30.0% benefits | BLS, equivalent to about 43% benefits on top of wages |
| Billable and paid time in Field Promax data | 5.7 billable / 8.8 paid hours | Field Promax via ACHR News, reported as 65% billable time |
| Flat-rate pricing adoption / net profit comparison | More than half use flat rate / 7% net versus 4% for other methods | ACCA Contractor of the Future study, not a promised result |
How are the labor rate and flat job price calculated?
The math behind the rate
$33 wage × 1.43 payroll loading gives $47.19 loaded wage. At 65% billable efficiency, labor cost per billable hour is $72.60. Five technicians at 2,080 paid hours and 65% efficiency produce 6,760 billable hours. $300,000 overhead adds $44.38 per billable hour. Break-even is $116.98; at a 10% target net margin, the target is $129.98.
A two-hour task, $150 parts, and 50% parts markup produces a $484.95 flat price. Direct cost is $295.20, gross profit before overhead is $189.75, and job gross margin is 39.1%.
Hourly rate
Loaded wage = wage × (1 + burden). Labor cost per billable hour = loaded wage ÷ billable efficiency. Company billable hours = technicians × annual paid hours × billable efficiency. Overhead per billable hour = annual overhead ÷ company billable hours.
Break-even and target
Break-even rate = labor cost per billable hour + overhead per billable hour. Target rate = break-even rate ÷ (1 − target net margin). Parts are priced separately.
Flat price and job result
Flat price = task hours × target rate + parts × (1 + parts markup). Direct cost = task hours × labor cost per billable hour + parts. Job gross profit = price − direct cost. Job gross margin = gross profit ÷ price.
Sources for HVAC labor assumptions
Sources and method
- BLS Occupational Outlook Handbook, “Heating, Air Conditioning, and Refrigeration Mechanics and Installers”
Last modified 29 October 2026. Used for the occupation-wide May 2025 median pay context and employment outlook, not as the calculator's default wage.
- Contracting Business, ACCA Contractor of the Future study coverage
5 December 2025. Used for ACCA's average contractor-reported technician wage of $33 an hour and $422 average service ticket.
- BLS Employer Costs for Employee Compensation
June 2026 data, released 9 September 2026. Private-industry wages were $32.82 per hour (70.0%) and benefits were $14.07 per hour (30.0%), equivalent to benefits about 43% on top of wages. Used for the default burden, labelled all private industry.
- Field Promax report, via ACHR News
16 June 2026. More than 10,000 data points from 300 HVAC companies. Used for the 65% billable-efficiency default.

Founder and CEO, HVAC SEO
Jacob Milner
What do HVAC owners ask about labor rates?
Load technician wages with payroll burden, divide by billable efficiency to get labor cost per billable hour, and add overhead per billable hour for break-even. Divide break-even by one minus your target net margin to get a target labor-only rate.
Break-even combines labor cost per billable hour and allocated overhead per billable hour. Target rate divides that amount by one minus your target net margin. Parts are priced separately in this labor-only rate.
Billable efficiency is the share of paid technician hours that are billed to customers. The default is 65%, based on a Field Promax report through ACHR News. Use your own measured figure if it differs.
Yes. The displayed flat-rate price adds task hours at the target labor rate to parts priced with your selected markup. The direct-cost figure includes task labor at labor cost per billable hour plus the parts cost before markup.
No. Target net margin is an input used to calculate the hourly labor rate. The flat job gross margin compares the displayed flat price with direct job cost and does not account for all company overhead.
Build a price that carries its share.
Reviewed by Jacob. Sent by email. No call required.